For the bridge in the Silvetti area of San Ginesio, C&G Engineering carried out the design verification. The project involves making the bridge safe through demolition and reconstruction.
Location
San Ginesio (MC)
Client
Municipality of San Ginesio
Period
January 2025 – July 2026
Works value
€623,070.01
Our role
Design verification for validation
The project
Design verification for making the bridge in the Silvetti area safe through demolition and reconstruction.
Design verification for validation
The assignment was awarded by the Municipality of San Ginesio. The verification checks that the design is complete, consistent and compliant with the regulations. It is the step that comes before validation and the award of the works. This makes it a key service for public works.
