Monte Radaldo and Bore municipal roads – Santa Vittoria in Matenano

Design verification

For the Monte Radaldo and Bore municipal roads, C&G Engineering carried out the design verification. The project covers the restoration of municipal roads in Santa Vittoria in Matenano.

Monte Radaldo and Bore municipal roads – Santa Vittoria in Matenano

Location

Santa Vittoria in Matenano (FM)

Client

Municipality of Santa Vittoria in Matenano

Period

Since September 2024 – pending approval

Works value

€912,415.12

Our role

Design verification for validation

The project

Design verification for the restoration of the Monte Radaldo and Bore municipal roads, under the special urban regeneration programme linked to the 2016 earthquake (Special Commissioner’s Ordinance no. 137/2023).

Design verification in the 2016 post-earthquake reconstruction

It is part of the urban regeneration programme linked to the 2016 earthquake. The verification checks that the design is complete, consistent and compliant with the regulations. It is the step that comes before validation and the award of the works. This makes it a key service for public works.